Operaciones y cadena de suministro · Gestión de la cadena de suministro

Stock Smart — Multi-Echelon Inventory at Noordveld Components

A four-round, intermediate inventory and operations simulation set inside Noordveld Components B.V., a €148M Tilburg-based distributor of industrial drive components serving the Benelux and western Germany.

4 rondas MBA / Máster English, Español

Vista previa

Sobre la simulación

A four-round, intermediate inventory and operations simulation set inside Noordveld Components B.V., a €148M Tilburg-based distributor of industrial drive components serving the Benelux and western Germany.

Noordveld runs a two-echelon network — one central distribution centre (CDC) holding 6,200 SKUs that replenishes four regional stocking points (RSPs) in Rotterdam, Eindhoven, Antwerp and Düsseldorf — and guarantees a 97% line-item fill rate within 24 hours to its top accounts.

On 9 March 2026 the promise is breaking: measured fill rate has slipped to 91.4%, yet inventory has ballooned to €31M and turns have fallen from 4.1 to 3.6. The board gives the planning team one S&OP cycle to fix service WITHOUT adding net working capital — or it outsources planning to a 3PL, cutting nine roles. Low service and high stock at once is the classic signature of inventory at the wrong echelon.

Playing the supply-chain planning team, you work the multi-echelon logic of Ton de Kok's research. Round 1 (Diagnose): segment the 40-SKU basket by volume AND variability (coefficient of variation), locate the €5.8M of dead RSP buffer, and find the under-buffered fast movers actually driving the fill-rate miss.

Round 2 (Plan): set a differentiated cycle-service-level policy and size safety stock with SS = z × σ, building reorder points on demand-during-lead-time — discovering that service is non-linear, with slow lumpy lines costing ~3× the buffer per service point of the fast movers.

Round 3 (Decide): place safety stock across the two echelons, exploiting risk pooling (the square-root law) by consolidating lumpy demand at the CDC while forward-deploying the fast stable lines, funding the redesign cash-neutrally from the dead stock and optimizing the network jointly rather than echelon-by-echelon.

Round 4 (Recover): stress-test the policy against a supplier lead time that doubles from 3 to 6 weeks and a +40% Düsseldorf demand spike, recomputing exposed reorder points and lateral-shipping from the central pool, then defend the plan to the board on the service-cost frontier.

The math rewards variability-aware segmentation, differentiated service targets, demand-during-lead-time reorder points, central risk pooling, cash-neutral redeployment and joint network optimization — and punishes the five classic errors: uniform 98% targets, forward-deploying everything, average-demand reorder points, buying out of the problem, and single-stage silo thinking.

Final KPIs track fill rate (%), inventory on hand (€M), inventory turns (×) and quarterly service P&L.

Para quién es

Una simulación de nivel intermedio para participantes que ya conocen los conceptos básicos de la materia, pensada para programas de máster y MBA.

Cómo funciona una sesión

  1. El docente crea una sesión desde el panel de Eureka e invita a los participantes.
  2. Los participantes juegan 4 rondas. En cada una envían sus decisiones y la simulación calcula los resultados.
  3. La simulación se puede jugar en: English, Español.
  4. El docente sigue el progreso y los resultados de cada participante desde el panel, y usa los resultados de la clase para el debriefing.

Decisiones que toman los participantes

Las decisiones que toman los participantes durante la simulación:

  • How do you segment the 40-SKU basket to find where the buffer is misplaced?
  • Where is the €5.8M of dead buffer hiding, and why?
  • Which SKUs are driving the fill-rate miss?
  • How much of this cycle’s effort do you commit to the diagnosis before acting? (%)
  • Set the cycle-service-level policy across segments (this sets the z-factor and the buffer).
  • How do you build the reorder points (ROP = demand-during-lead-time + safety stock)?
  • You test the marginal cost of each service point. How do you read it?
  • Target cycle service level for the fast, service-critical segment (%).
  • The core call: where do you place the safety stock across the two echelons?
  • How do you fund the redeployment under the cash-neutral constraint?

Qué siguen los participantes

Lo que los participantes siguen en pantalla a medida que avanzan las rondas:

  • Your Planning Decisions This Round
  • Round-by-Round Planning Record
  • Service vs. Working Capital Trajectory

Temas que cubre

Diseñada para asignaturas de Gestión de la cadena de suministro.

¿Quieres usar Stock Smart — Multi-Echelon Inventory at Noordveld Components con tus estudiantes?

Escríbenos y te preparamos una sesión de prueba gratuita.

Contactar